St John's Drawing

Oil painting of St John's Anglican Church, Finch St, East Malvern

Stainglass window

scaffold on tower

Restoration Works

Help Please

An easy, immediate way to help by depositing with the Anglican Development Fund: you support St John’s and receive a good interest rate.  We need $138,032 more on deposit with ADF.  Our loan of $368,500 to finish the hall refurbishment and continue with the Church Tower restoration is backed by deposits from St John’s and its parishioners totalling $267,318 but to get the best interest rate from ADF we need to increase this to $405,350 (110% of our loan).  

Can you help?  

For more information, please call
Jon Eddy on 9509 2566
or
email:
eddys@bigpond.net.au,
or visit
www.melbourne.anglican.com.au/adf





Church Restoration



    New cut and carved stones ready for installation



New upper string course stones


New Sill stones ready for setting in place

Work is progressing well on the repair of the tower East and South faces.  Loose flaking stone has been chipped off and repointing commenced completed.  New stone  is being laid as required.  The concrete parapet has crumbled due to rusting of the reinforcing and South and East facing sides have now been repaired.  Maintenance will be carried out on the lead light windows while the scaffold is in place.  The repair work will be completed in November 2006 at a cost of $280,000.  If funding can be arranged, the scaffold will be purchased and sold when the repairs to the whole of the stonework are complete.  The work is ahead of schedule.

Complete repair of the church building will take some years to complete.


Restoration of Stained Glass Windows

Two of the stained glass windows will be restored in 2006/7  and protective screens will be  replaced on others.




Designed by: Heathmont Enterprises
for
© St John's Anglican Church, East Malvern, 2000

7 Finch Street, East Malvern 3145
Ph: 9571-6616
Fax: 9572-4662
email:
vicar@stjohnseastmalvern.org.au